BSH-300
Ethernet/ICCP Command Converter
Three different control architectures are supported by the new OCP-300 Operation Control Panel and BSH-300 Ethernet/ICCP command converter, each with a wide range of camera control capability. The BSH-300 is used for converting command between Ethernet and ICCP, allowing previous control panels such as the OCP-200 and MCP-200, to be integrated into the Ethernet network system.
Type-A:OCP-100, OCP-200, RM-51A
Type-B:OCP-300
Type-C:OCP-100, OCP-200, RM-51A, MCP-200
(There are three types of BSH-300, Type-A, Type-B and Type-C, each with a different type and number of connectors.)
*Specifications are subject to change without notice.
Ratings | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Power Requirement | 100 to 240 V AC | ||||||||||||||||||||
Power Consumption | 150 VA | ||||||||||||||||||||
Operating Temperature | 0 to 45 °C | ||||||||||||||||||||
Storage Temperature | -25 to 60°C | ||||||||||||||||||||
Operating Humidity | 30 to 90% *Non-condensation | ||||||||||||||||||||
Dimensions | W 217.5 x H 38.6 x D 400 mm | ||||||||||||||||||||
Weight (Excluding Stand) | Approx. 2.6 kg | ||||||||||||||||||||
|
- Personal information is required
- Software
To download these information, personal information is required.
Click the upper right button to download.
News
-
April 14, 2025
Broadcast
Crossroads Church Selects Ikegami HDK-X500 Cameras for New Dayton Campus
-
March 31, 2025
Broadcast
Express Media, San Francisco, Expands with Ikegami UHK-X700 4K HDR Camera Systems
-
March 26, 2025
Broadcast
WPLG Channel 10 TV, Miami, Chooses Ikegami HDK-X500 HD HDR Camera Systems for New Studio
-
February 18, 2025
Broadcast
Ikegami Electronics Announces US Market Introduction of IPX-100 IP Gateway
-
February 13, 2025
Broadcast
Production Crew Chooses Ikegami UHK-X700 4K-UHD Cameras for 12G-SDI OB Truck
Events
-
March 17, 2025
- Broadcast
NAB Show 2025
Event Period:Sunday, April 6, 2025 to Wednesday, April 9, 2025
Archive
-
November 7, 2024
- Broadcast
Inter BEE 2024
Event Period:Wednesday, November 13, 2024 to Friday, November 15, 2024 10:00 to 17:30
Archive
-
September 11, 2024
- Broadcast
IBC2024
Event Period:Friday, September 13, 2024 to Monday, September 16, 2024
Archive
-
May 28, 2024
- Broadcast
Broadcast Asia 2024
Event Period:Wednesday, May 29, 2024 to Friday, May 31, 2024
Archive
-
March 13, 2024
- Broadcast
NAB Show 2024
Event Period:Sunday, April 14, 2024 to Wednesday, April 17, 2024
Archive